ECP process
Jump to navigation
Jump to search
ECP PROCESSING
| Temperature °C | Time | |
|---|---|---|
| PRE WASH ( with warm water ) | ± 38 | 2 - 5 min |
| ECP-1( Developer) | 36.7 ± 0.1 | 3 min |
| ECP-2 (Stop) | 27 - or more | 1 min |
| wash 2x fresh water | 27 - or more | 30 sec each |
| ECP/N3 (Bleach) | 27 - or more | 1 -3 min |
| wash 3x fresh water | 27 - or more | 30 sec each |
| ECP/N-4 (FIX) | 27 - or more | 2 - 3 min |
| Wash (under running water) | cold / room temp. | 2 min or more |
| Photoflo | 27 ± 1 | 30 sec |